CLIENT: SPDC
PROJECT TITLE: FYIP 5 OIL WELLS COMPLETION WORKS.
LOCATION: NEW ESTUARY FLOW STATION (NEFS) – FORCADOS OFFSHORE OIL FIELD
VESSELS DEPLOYED: –
SEWOPS: MV Tiger Shark
MV Scamp
EMERGENCY RESPONSE VESSEL: MV Thethis
SECURITY VESSEL: MV Rhema Star
CREW BOAT: MV Joetek Azaebi
SCOPE OF WORK:
- Engineering analysis and design.
- Asset integrity of all riser clamps.
- Pipeline flooding and subsea diving.
- Fabrication, NDT, and installation of #4 8” bulkline subsea risers and hookup to existing topside piping
- Pipeline flooding carried out between clusters JB, 5A to NEFS.
- Diving operations to install #4 smart flanges
- Diving operations for the installation of concrete mattresses and sand bags
- Pre-commissioning activities.
DIVING SUPPORT SUBCONTRACTOR: Subtech Offshore Services Nigeria Ltd
(James Fisher Subtech Group)
SMART FLANGE CONNECTORS SUPPLIER: Oceaneering/Craymond Nigeria Limited
DURATION: 3 Months
STATUS: Completed