Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-plugin-bluehost domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/strides1/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the google-analytics-for-wordpress domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/strides1/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the archi domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/strides1/public_html/wp-includes/functions.php on line 6121

Project Details

Client:
SPDC
Project Name:
BONNY NATURAL GAS (B-NAG) LIQUID DEBOTTLENECKING PROJECT
Location:
BONNY OIL AND GAS TERMINAL, BONNY
Year Completed:
2018
Category:
Bonny

Project Overview

VESSELS DEPLOYED:
Tug boat: MV LOLO II
Barge: STRIDES B2
SCOPE OF WORK:
• Decommissioning of existing slug flash vessel.
• Rehabilitation of Nominated HP Separator Vessel.
• Installation of Rehabilitated HP Separator Vessel
• Fabrication/ Mani-folding and installation of the 3’’ stainless steel HP separator
• Installation Of New process Water Pumps (P-8165 A/B)
• Installation of control valves- LCV401 A/B, PCV 406A/B, 81-SDV 405. 81-SDC 402, PCV 406, 81-SDV 330, 81-FCV 320, 81-FCV 330
• Installation of 2’’ flow meter
• Modification of the slug catcher outlet arm
• Fabrication/ manifolding and installation of all open and closed drains
• Lay and welding of 6’’ and 2’’ condensate line (1000m) long to Incoming manifold.
• Construction, mani-folding and installation of 4’’ Gas line to flare scrubber manifold.
• Fabrication and installation of 10’’Valve platform.
• Modification of the 10’’ and 12’’ Export inlet line and the outlet of the Pre-bypass separator line
• Modification of 6’’HP separator relief line.
• Replacement of Slug Catcher Level Control Valves.
• Modification of The By-pass Separator Gas outlet Piping.
• Replacement Of Undersized Bonny 31 F/L PC
• Blasting and painting activity
• Commissioning
DURATION: 2 years
STATUS: Completed