Emergency Response System Project Bonny

Emergency Response System Project Bonny

CLIENT: SPDC

PROJECT TITLE: BONNY EMERGENCY RESPONSE SYSTEM PROJECT

LOCATION: BONNY OIL AND GAS TERMINAL, BONNY

VESSELS DEPLOYED: –

 

Tug boats: MV LOLO I

                   MV SOMKE

 

Ramp barges: STRIDES B2

                       MV IBHADE 1

SCOPE OF WORK:-

  • Fabrication and installation of of 20’’ pipeline – 1000m fire line
  • Unbolting of existing/ bolting of newly installed line
  • Hydro testing of newly welded 20’’ line (1000m) long.
  • Excavation work / In-situ construction of concrete supports.
  • By-passing of 48’’ line through a rupture disc to the 20’’ line.
  • Hook up newly installed line to tank

DURATION: 10 months

STATUS: Completed