Cluster 5A FYIP 5 Oil Wells Completion Project

Cluster 5A FYIP 5 Oil Wells Completion Project

CLIENT: SPDC

PROJECT TITLE: FYIP 5 OIL WELLS COMPLETION WORKS.

LOCATION: CLUSTER 5A – FORCADOS ESTUARY OFFSHORE OIL FIELD

VESSELS DEPLOYED:

SEWOPS:      MV Tiger Shark

                        MV Black Jack

EMERGENCY RESPONSE VESSEL: MV Thethis

SECURITY VESSEL: MV Rhema Star

CREW BOAT: MV Joetek Azaebi

SCOPE OF WORK:

  • Fabrication, NDT, and installation of all topside piping spools.
  • Hook up of already installed bulkline, and #1 bulkline riser to topside.
  • Conversion of all actuated choke valves to manual.
  • Replacement of corroded and missing bolts, nuts with PTFE coated bolts, and nuts
  • Replacement of dummy and missing spools on the topside.
  • Grit blasting and painting of the entire cluster structures.
  • Complete pre-commissioning and N2 inerting to 3bar.
  • Subsea diving operations for the inspection of riser clamps and flanges.


DIVING SUPPORT SUBCONTRACTOR: Subtech Offshore Services Nigeria Ltd
                                                                   (James Fisher Subtech Group)

SMART FLANGE CONNECTORS SUPPLIER: Oceaneering/Craymond Nigeria Ltd

DURATION: 2 Months.

STATUS: Completed