• Africa's Frontline Offshore Oil and Gas Construction Company
  • +2349043826411
    SEWOPS
    Petroleum Tank Construction
    KM 6, East-West Road,
    Port Harcourt, Nigeria

BONNY NATURAL GAS (B-NAG) LIQUID DEBOTTLENECKING PROJECT

BONNY NATURAL GAS (B-NAG) LIQUID DEBOTTLENECKING PROJECT

CLIENT: SPDC

PROJECT TITLE:BONNY NATURAL GAS (B-NAG) LIQUID DEBOTTLENECKING  PROJECT

LOCATION: BONNY OIL AND GAS TERMINAL, BONNY

VESSELS DEPLOYED:-

Tug boat: MV LOLO II                  

Barge: STRIDES B2

SCOPE OF WORK:-

  • Decommissioning of existing slug flash vessel.
  • Rehabilitation of Nominated HP Separator Vessel.
  • Installation of Rehabilitated HP Separator Vessel
  • Fabrication/ Mani-folding and installation of the 3’’ stainless steel HP separator
  • Installation Of New process Water Pumps (P-8165 A/B)
  • Installation of control valves- LCV401 A/B, PCV 406A/B, 81-SDV 405. 81-SDC 402, PCV 406, 81-SDV 330, 81-FCV 320, 81-FCV 330
  • Installation of 2’’ flow meter
  • Modification of the slug catcher outlet arm
  • Fabrication/manifolding and installation of all open and closed drains
  • Lay and welding of 6’’ and 2’’ condensate line (1000m) long to Incoming manifold.
  • Construction, mani-folding and installation of 4’’ Gas line to flare scrubber manifold.
  • Fabrication and installation of 10’’Valve platform.
  • Modification of the 10’’ and 12’’ Export inlet line and the outlet of the Pre-bypass separator line
  • Modification of 6’’HP separator relief line.
  • Replacement of Slug Catcher Level Control Valves.
  • Modification of The By-pass Separator Gas outlet Piping.
  • Replacement Of Undersized Bonny 31 F/L PC
  • Blasting and painting activity
  • Commissioning

DURATION: 2 years  

STATUS: Completed