Adebayo Karunwi (Manager, Asset Engineering SPDC)
Strides performed excellently in the execution and commissioning of the Belema Flowstation Environmental Upgrade Project and associated Asset Integrity works. The project which was executed in fulfillment of Shell’s Process Safety Basic Requirement (PSBR), was delivered by STRIDES ahead of schedule despite the tough HSE, Security and Logistics challenges in the swamps of Eastern Delta; thus contributing to the achievement/sustenance of Goal Zero and increase in Production.